The Descoberto-7 Station treats water from Lake Descoberto, on the border between OmniTerra territory and the Brasília REGEST. The reservoir is real and has nearly run dry once [7]; the station, the village and the data centre are fiction.
The situation + contribute
- 92% of the treated water goes through the Planalto Main to the Planalto Core, OmniTerra's data centre.
- 6% goes to Brasília through the Old Main, as the Humanitarian Contract of 2097 requires.
- For three years, the Ladle Cell has been tampering with Meter 14 and sending an extra 9% to Brasília. In the city, that water goes to the hospitals.
What the auditor came to do + contribute
Auditor Celeste Prado-Vasconcelos did not come for the fraud. She came to prepare the end of the contract: in 30 days the Old Main will be shut for the Planalto II Expansion, and the station's staff will be relocated to Alcântara, or dismissed. The audit is the inventory of everything the company is going to move: pipes, pumps, people and implants.
The problem is that, if she looks closely, she will find Meter 14.
How the adventure ends + contribute
It does not. The scenes The News and The Valve are left open. Where the story can go lists paths for the table to follow.